WAWNITURE by Wawrzyniak
Hotel and commercial furniture
Hotel and development furniture needs a consistent standard and a scope that fits the construction schedule. We review furniture packages for rooms, apartments and shared spaces, working with the investor and design team.

Project scope and documentation
Room schedules, drawings, material specifications and quantities form the starting point. We separate repeatable packages from individual items to compare scopes and identify missing information. Together we establish who approves drawings and changes. A reception or shared-space design needs a different review from a series of guest-room packages, even when they use the same materials.
Use and material requirements
Intensity of use, cleaning and the ability to replace parts deserve particular attention in commercial premises. Material selection should reflect the project requirements and manufacturer documentation. If specific classifications or certificates are required, provide them before quoting. A finish suitable for a home should not automatically be assumed to meet hotel or public-space requirements.
Phased delivery and installation
Floor count, lift access and room readiness affect logistics. We agree delivery order, storage conditions and responsibility for site access. For repeatable furniture, details and material samples should be confirmed before series production. Handover should refer to the agreed scope and drawings, with a clear method for recording any observations.
What affects the price?
We quote each scope individually. Cabinet length alone is not enough to compare offers: construction, materials, equipment and delivery and installation conditions all matter.
Quantities, number of furniture types, materials, documentation requirements and phasing affect the price. Location, transport restrictions and the number of installation mobilisations should be known when comparing offers.
What should you prepare for the first conversation?
Provide room and quantity schedules, drawings, material specifications, technical requirements and the programme. Add the location, access rules and responsibilities for equipment, worktops and services. Identify any incomplete documentation in the enquiry.
Request a quoteFrom documentation to installation
We start by reviewing the plan, your needs and the scope. You can send an architect’s completed design or materials for an initial conversation.
Before production, we confirm measurements, materials, layout and construction details. Execution documentation records the decisions about the furniture and its interfaces with services and interior finishes.
We agree the schedule individually after defining the scope and site conditions. Production, delivery and installation lead to a shared final handover.
Questions before ordering
Can deliveries be phased?
Yes, we review phasing against the scope and site readiness. Dates, phase count, access and storage need agreement before the programme is confirmed.
Are all materials certified for hotel use?
Requirements must be defined in the project documentation. We verify the availability of relevant evidence for specific materials and solutions; we do not claim blanket certification without reviewing the scope.
When will I receive the first quote?
We prepare the first quote within 48 business hours of receiving the complete materials needed to assess the scope. If anything is missing, we first identify the questions and documents to complete. The production and installation schedule is agreed separately.
Let’s discuss your fitted furniture
Send a plan, photographs or documentation and the project location. We will identify the information needed for an individual quote.
Request a quote